Inspection planning

Quality begins with an inspectable drawing.

We align part revision, critical dimensions, measurement method and requested records before manufacturing. Documentation scope is confirmed in the quotation.

A part can match the CAD model and still fail its intended function if datum relationships, fits, threads or finish requirements are unclear. Quality planning turns those requirements into measurable checkpoints.

Inspection workflow

1. Contract review

Confirm drawing revision, material, quantity, finish, tolerances and any required certificates or inspection format.

2. Measurement plan

Identify critical-to-function features and choose suitable calibrated equipment and sampling.

3. In-process control

Check setup-sensitive features during production so correction is possible before a full batch is completed.

4. Final release

Verify required characteristics after relevant secondary processes and assemble the agreed records.

Documents to request

DocumentWhen it helpsRFQ instruction
Dimensional reportCritical dimensions or first production lotMark reportable characteristics on the drawing
First article reportNew part introduction or controlled approvalState the required customer or industry format
Material recordGrade or heat/lot traceability mattersRequest it before material is purchased
Finish certificateSecondary process complianceName the required process standard
Certificate of conformancePurchase-order compliance recordProvide the exact wording or template if controlled

Measurement strategy

Calipers and micrometers are efficient for accessible size features. Height gauges, indicators, gauges, optical systems and coordinate measurement may be selected for datum-related or complex geometry. The method must match the tolerance and feature definition.

Important: Certifications, full traceability, special sampling plans and customer-specific reports are not assumed. Request them in the RFQ so feasibility, lead time and cost can be reviewed before order.

Revision control

  • Place a revision identifier on both the model package and drawing.
  • Avoid sending several similarly named files without identifying the released version.
  • Document approved deviations rather than relying on chat history.
  • For reorders, state whether the previous revision remains valid.